Two week schedule posted below. Additional updates will be posted as available for future work and final paving of roadway and sidewalks.
NOTE: Sidewalks within the project area that have been paved are currently paved as a base course only. Concrete ADA ramps at Atlantic Avenue and Wyman Road, Hewitt Street, and Bubier Road will be installed prior to final paving operations. Once roadway paving is complete, final sidewalk grading and surface paving will be performed to match the finished road elevations. As needed, the contractor will be applying loam and seed following final sidewalk paving.
This Roadway & Sidewalk Improvement project is a result of 2022 Annual Town Meeting Article 11.